Steel that goes up in days and stands for a century
A factory-made steel structure, engineered to your plans, that your crew stands in days. Then the finished home around it.


From plans to standing frame
Your architect's plans become engineered steel drawings. Wall, floor and roof panels are formed to those drawings, labeled by position and shipped ready to assemble. Screws, not welds. No specialized trades. The frame is standing in days.
Why steel
Steel does not burn, rot, warp or feed termites. It is made to the millimeter, weighs a fraction of concrete block, and is the most recycled material on earth. It carries the long spans and glass walls of a modern home.
| Property | Light-gauge steel | Wood | Concrete block |
|---|---|---|---|
| Speed | Days | Weeks | Weeks, plus curing |
| Interiors | Long spans, open plans, floor-to-ceiling glass | Limited | Limited |
| Non-combustible | Yes | No | Yes |
| Immune to termites and rot | Yes | No | Yes |
| Dimensionally stable | Yes | Shrinks and warps | Yes |
| Weight | Light | Light | Heavy, with heavier foundations |
| Precision | Made to the millimeter | Cut on site | Laid on site |
| Recycled content | Highest of any building material, fully recyclable | Renewable | Low |
| Hurricane performance | Engineered connections, tested assemblies | Requires extensive strapping | Strong, the traditional choice |
Structure to hardware, one order
Every part of the home, quoted against your drawings and delivered by phase.
- StructurePanels, connections, fasteners and anchors.
- EnvelopeSheathing, insulation, weather barrier, cladding, stucco systems, soffits and gutters.
- RoofingMetal roofing.
- Windows and doorsImpact rated windows and doors, with the product approvals the code requires.
- InteriorDrywall, flooring, tile and stone.
- MillworkKitchens, closets and vanities.
- FixturesPlumbing fixtures and hardware.
- OutdoorTerraces, pool decks and pergolas.
Six steps, one partner
Durations are confirmed per project. What you receive at each step is not.
Consultation
Site, program, budget and timeline. We reply within 24 hours.
Design and engineering
Your architect or ours. We engineer the structure and foundations to the plans.
Quote
Every item, line by line against the permit set, with your finishes selected.
Manufacturing
Panels made to the drawings. Every other material procured, inspected and packed by room.
Delivery
Frame first, finishes last, with packing lists on every pallet in English and Spanish.
Assembly and handover
We guide your contractor through the frame and stay engaged through the finishes.
Your crew builds it
Panels arrive labeled by position with assembly drawings. Connections are screwed, not welded, so your existing crews stand the frame without new certifications. Materials follow by phase with packing lists on every pallet.
Your design. Our engineering
Light-gauge steel carries long spans and large glazed openings without the section depths of wood. Shop drawings, structural calculations and product approvals are delivered for coordination and permitting.
Start your build
Send us your plans. Full quote in 48 hours.