Technology

Steel that goes up in days and stands for a century

A factory-made steel structure, engineered to your plans, that your crew stands in days. Then the finished home around it.

The Saint-Donat residence under construction, its light-gauge steel frame sheathed, with the steel studs and trusses visible through the openings
Saint-Donat Residence · Québec
Crew setting light-gauge steel wall panels on a slab
Wall panels set on the slab
How it is made

From plans to standing frame

Your architect's plans become engineered steel drawings. Wall, floor and roof panels are formed to those drawings, labeled by position and shipped ready to assemble. Screws, not welds. No specialized trades. The frame is standing in days.

Start your build

See it built

Factory to front door

Steel, wood and concrete block

Why steel

Steel does not burn, rot, warp or feed termites. It is made to the millimeter, weighs a fraction of concrete block, and is the most recycled material on earth. It carries the long spans and glass walls of a modern home.

PropertyLight-gauge steelWoodConcrete block
SpeedDaysWeeksWeeks, plus curing
InteriorsLong spans, open plans, floor-to-ceiling glassLimitedLimited
Non-combustibleYesNoYes
Immune to termites and rotYesNoYes
Dimensionally stableYesShrinks and warpsYes
WeightLightLightHeavy, with heavier foundations
PrecisionMade to the millimeterCut on siteLaid on site
Recycled contentHighest of any building material, fully recyclableRenewableLow
Hurricane performanceEngineered connections, tested assembliesRequires extensive strappingStrong, the traditional choice
What is included

Structure to hardware, one order

Every part of the home, quoted against your drawings and delivered by phase.

  • StructurePanels, connections, fasteners and anchors.
  • EnvelopeSheathing, insulation, weather barrier, cladding, stucco systems, soffits and gutters.
  • RoofingMetal roofing.
  • Windows and doorsImpact rated windows and doors, with the product approvals the code requires.
  • InteriorDrywall, flooring, tile and stone.
  • MillworkKitchens, closets and vanities.
  • FixturesPlumbing fixtures and hardware.
  • OutdoorTerraces, pool decks and pergolas.
Process

Six steps, one partner

Durations are confirmed per project. What you receive at each step is not.

01

Consultation

Site, program, budget and timeline. We reply within 24 hours.

You receiveA scope outline and a preliminary budget range.
02

Design and engineering

Your architect or ours. We engineer the structure and foundations to the plans.

You receiveStamped structural drawings and the documents required for permitting.
03

Quote

Every item, line by line against the permit set, with your finishes selected.

You receiveA full quote within 48 hours of a complete drawing set, with compliance documents for every material.
04

Manufacturing

Panels made to the drawings. Every other material procured, inspected and packed by room.

You receiveProduction updates and a delivery schedule by phase.
05

Delivery

Frame first, finishes last, with packing lists on every pallet in English and Spanish.

You receivePhased deliveries timed to your construction schedule.
06

Assembly and handover

We guide your contractor through the frame and stay engaged through the finishes.

You receiveThe warranty schedule for every product and the complete documentation set.
For contractors

Your crew builds it

Panels arrive labeled by position with assembly drawings. Connections are screwed, not welded, so your existing crews stand the frame without new certifications. Materials follow by phase with packing lists on every pallet.

Start your build

For architects

Your design. Our engineering

Light-gauge steel carries long spans and large glazed openings without the section depths of wood. Shop drawings, structural calculations and product approvals are delivered for coordination and permitting.

Start your build

Start your build

Send us your plans. Full quote in 48 hours.